Major joist deflection repairs
Our client had a nyc building code violation which included three joists that were held up by a central girder. We installed three new joists bolted to the existing deflected joists. We removed the violation and installed a new drop ceiling.
|
Date: 11/29/2009
Owner: Trinity Development Group Inc
Size: 7 items
|
|
IMG_30200003
Header is currently being held up by a temporary steel jack.
Date: 10/02/2009
Views: 92
|
IMG_27020019
This picture shows how the joist all rest on a wood Beam that is held up by 2" * 4" studs. This framing is very inefficient for the loads they carry, hence the building sagging.
Date: 09/21/2009
Views: 68
|
DSCN01650050
We removed the 2" * 4" framing and installed a new brick bearing wall to carry the loads efficiently down to the rubble stone foundation
Date: 10/16/2009
Views: 47
|
|
IMG_41550013
Here is a picture of the illegal central girder holding up the deflected joists
Date: 11/11/2009
Views: 75
|
IMG_41830041
Three joists sistered with new 3" * 12" * 19'
Date: 11/13/2009
Views: 81
|
IMG_42120052
This photo shows how we sistered with three deflected joists, and how we installed new Steel hangers. We also sistered the header and added new steel hangers to the header as well
Date: 11/17/2009
Views: 83
|
|
IMG_43030002
After we tightened all bolts and had the engineer approve all work we added a light gauger aluminum drop ceiling so we can add extra sound dampening insulation, and level the new ceiling.
Date: 11/22/2009